top of page

VILLALOBOS
BUILDERS, LLC

Projects

The project entailed a full renovation of the state-operated laboratory, including the complete demolition and replacement of existing interior infrastructure and systems. Our scope encompassed the removal of all existing partitions, flooring, ceilings, lighting, electrical systems, plumbing, and laboratory fixtures. In their place, we installed:  4-Level Epoxy-coated flooring in the garage  ESD (electrostatic dissipative) flooring throughout laboratory workspaces  New fire-rated wall assemblies  Laboratory-grade ceiling grid and acoustical ceiling tiles

State of New Mexico
HAROLD RUNNELS BUILDING
LAB RENOVATION PROJECT

Villalobos Builders, LLC proudly served as the prime contractor on the Harold Runnels Laboratory Renovation Project, delivering a transformative overhaul to the State of New Mexico’s critical Surface Water and Ground Water Laboratory.  

This high-performance renovation was executed under a Design-Bid-Build delivery model, with Dyron Murphy Architects as the designer of record and Villalobos Builders leading the charge in construction execution and project delivery.

NM Gen Svcs dept logo_edited.jpg

City of Albuquerque

Fire Station 06

Villalobos Builders, LLC proudly served as the prime contractor for the Fire Station 06 Window Replacement Project, providing the City of Albuquerque with a much-needed upgrade to improve energy efficiency, building performance, and overall comfort for its frontline emergency personnel.

This project involved a like-for-like replacement of outdated windows with modern, energy- efficient black vinyl units, and was executed without a designer of record.

 

Villalobos Builders managed all aspects of construction and closeout, ensuring the work was completed efficiently and with a focus on long-term building integrity.  Scope of work included: Demolition and removal of 27 existing windows and interior blinds

City of ABQ logo_edited_edited.png

© 2035 by Go Solar.
Powered and secured by Wix

bottom of page